Critical Path Traversal Enables Enumeration of Root and User Home Directories

Disclosed by
alan_olazabal
Summary by alan_olazabal

The application is vulnerable to an arbitrary directory traversal attack through the ?&dir= parameter. By supplying specially crafted input an attacker can traverse the server’s filesystem beyond the intended scope, enabling enumeration of directories and files across all the server

Activity